74 Part Number STH12 9/10
Sequence of Operation (Non-ERC)
PRE-MIX REFRIGERATION UNIT
Ice Bank Is Required
1. Check water bath for full ice bank.
2. The stabilized water bath operating temperature
must be maintained at 33°F (0.6°C) to 35°F
(1.7°C).
The following is a sequence of operations for the
Multiplex Pre-mix Beverage equipment.
1. Once a drink is dispensed, the following will
occur:
A. For a Syrup Tank System, the Pre-mix syrup
is manually mixed at the store. Pre-mix
beverage is then transferred to a holding tank
for supply to the Multiplex system.
B. For a Bag-In-Box System, pre-mix syrup is
drawn from a Bag-In-Box by means of a gas
driven syrup pump.
2. The carbonator pump (stainless) pulls the 5:1
pre-mix out of the 3 gallon holding tank and injects
it into the pre-mix carbonator tank where the CO
2
pressure is 35 psi (2.4 bar) on the tank.
3. The circulator pump runs continuously and
circulates water bath water through the conduit to
provide cooling for all drinks.
Kommentare zu diesen Handbüchern