Manitowoc CMS050A004 Spezifikationen Seite 72

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 88
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 71
72
IMPORTANT
Manifold gauges must be removed properly to
ensure that no refrigerant contamination or loss
occurs. A quick disconnect is required for the
high side connection.
Recovery/Evacuation
1. Place the toggle switch in the OFF position.
2. Install manifold gauges, charging scale, and
recovery unit or two-stage vacuum pump.
3. Open the high and low side valves on manifold
gauges.
4. Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as
directed by the manufacturer’s instructions.
B. Perform a nitrogen pressure test to verify
leaks are not present.
C. Evacuation prior to recharging: Pull the
system down to 500 microns.
NOTE: Check access fittings for leaks with an
electronic leak detector after charging the ice machine.
Seitenansicht 71
1 2 ... 67 68 69 70 71 72 73 74 75 76 77 ... 87 88

Kommentare zu diesen Handbüchern

Keine Kommentare